A walk-in shower conversion is the most requested single-scope bathroom project in Berkeley: remove the old tub or fiberglass surround, waterproof the framing correctly, tile a curbless or low-curb walk-in, hang a glass panel or door, and set a modern pressure-balanced valve. Most conversions here run $18,000 to $32,000 depending on size, tile selection, and glass. Turnaround is typically 3 to 4 weeks including inspection scheduling. The waterproofing system, a bonded membrane like Schluter Kerdi or a liquid-applied membrane over cement board, matters more than any finish decision, because it is the difference between a shower that lasts decades and one that quietly rots the framing of a hundred-year-old house.